top of page

Hydropower plant consists of:
1-Upper & Lower Tanks.
2-Pelton Wheel Turbine.
3-Centrifugal pump.
User has to assign the power needed from the system in order to discover design aspects.


**MatLab-SimuLink should be used to run the model.


Copyright © 2007 by Mohamed A. Sharaf Eldean Ayoub

All rights reserved. No part of this work may be reproduced, distributed, or transmitted in any form or by any means, including photocopying, recording, or other electronic or mechanical methods, without the prior written permission of the publisher (Mohamed A. Sharaf Eldean Ayoub). For permission requests, write to the publisher, addressed “Attention: Permissions Coordinator,” at the address below.

 

REDS Software Library

https://www.redslibrary.com

Kuala Lumpur Malaysia

mohamedsheraf@redslibrary.com

00601139795943

All Rights Reserved

___________________

Hydro Power Plant (PWT & Cent Pump)

SKU: AUXhydropwtcent
€150.00 Regular Price
€142.50Sale Price
  • User can reform the model based on his need. Dynamic modeling is allowed.

bottom of page